Georgia Tech, Marcus Nanotechnology Cell Manufacturing Facility

PXL_20241125_213458243
Project Description

The project area includes approximately 2,800 SF of laboratory and support space. The lab areas are designed to biosafety level (BSL) 2 standards and the cleanrooms are largely ISO 7 and ISO 8 classifications. The lab spaces also include one GLP lab, two GMP labs (each with a gown-in space), a testing space, de-gowning airlock, clean and dirty wash spaces, a clean corridor, a controlled corridor, and other associated support spaces.

Systems Commissioned
HVAC, Electrical, Plumbing, Lab Enclosure, Access Controls

Project Details

Location:
Atlanta, GA

Dates of Service:
2017- 2019

Size:
2,800 SF

Services Performed

Commissioning

Need Sustainable Solutions?